A Phase 1 environmental site assessment report can run well over 100 pages once maps, database reports and historical records are attached. You don’t need to read every page to make a good decision. This guide explains the main sections of an ASTM E1527-21 Phase 1 report, what each one tells you, and the five things buyers and lenders should check first.
The Main Sections of a Phase 1 ESA Report
1. Executive Summary
The most important few pages. It lists the property, the scope, and the findings: any recognized environmental conditions (RECs), controlled RECs (CRECs), historical RECs (HRECs), significant data gaps and recommendations. Geo Forward writes executive summaries so a lender or buyer can understand the conclusions in under a minute.
2. Introduction, Scope and Limitations
Explains who the report is for (the “user”), what standard it follows, what is outside its scope and any special terms. Check that your name, or your lender’s name, appears as a user or that a reliance letter is provided.
3. Site Description
The property address, parcel numbers, size, buildings, current uses, utilities and surrounding properties.
4. User-Provided Information
ASTM E1527-21 asks the user to provide certain information, including title and environmental lien search results, activity and use limitations, any specialized knowledge, and whether the purchase price reflects a reduction for environmental issues. Missing user information can be listed as a data gap. See the user questionnaire.
5. Records Review
Results of federal, state, tribal and local environmental database searches within ASTM search distances, plus historical sources such as aerial photographs, fire insurance maps, city directories, topographic maps and building permits. The historical review traces the property’s use back to its first developed use or 1940, whichever is earlier.
6. Site Reconnaissance
What the environmental professional saw during the site visit: storage tanks, drums, chemical storage, staining, drains, sumps, odors and other indicators, along with what could be observed on adjoining properties.
7. Interviews
Information from owners, occupants, managers and local government officials about the property’s past and present uses.
8. Findings, Opinions and Conclusions
The heart of the report. Each finding is evaluated and classified as a REC, CREC, HREC, de minimis condition or business environmental risk, with the professional’s reasoning.
9. Data Gaps
Information the professional could not obtain, such as missing historical records or areas that could not be accessed, and whether those gaps are significant to the conclusions.
10. Recommendations
Suggested next steps, such as a Phase 2 environmental site assessment, regulatory file review or tank survey. ASTM does not require recommendations, but most lenders expect them.
11. Environmental Professional Declaration and Appendices
The signed statement that an environmental professional meeting federal qualifications performed the assessment, followed by maps, photographs, the database report, historical records and qualifications.
Five Things to Check First
- Are there any RECs? If yes, read what they are and whether a Phase 2 is recommended.
- Are there significant data gaps? A gap in the property’s history can hide a past use that matters.
- Is the report still viable? Check the dates of the interviews, lien search, records review, site visit and declaration. The 180-day clock starts from the earliest one. See how long a Phase 1 is good for.
- Did it consider vapor migration? ASTM E1527-21 makes clear that contamination can migrate as vapor, which matters for nearby dry cleaners and gas stations.
- Can you rely on it? Make sure you are named as a user, or that the preparer will issue a reliance letter.
What a Phase 1 Report Does Not Cover
Standard Phase 1 reports exclude non-scope items unless you request them, including asbestos, lead-based paint, radon, mold, wetlands, lead in drinking water and regulatory compliance. Your lender may ask for some of these. A Phase 1 also does not test soil or groundwater; that is the role of a Phase 2.
Questions About Your Phase 1 Report?
Geo Forward prepares ASTM E1527-21 Phase 1 ESAs nationwide and is happy to explain findings to buyers, lenders and attorneys. Call (888) 930-6604 or complete our pre-consultation questionnaire.
Sources
- eCFR: 40 CFR Part 312, Standards for Conducting All Appropriate Inquiries
- U.S. EPA: Brownfields All Appropriate Inquiries
Technical Review
Reviewed by Adam Azad Kaligi, PG
Founder and Licensed Professional Geologist, Geo Forward, Inc.
Last updated: November 2026










