LAFD Chief’s Regulation 4 (Reg 4) Testing

Chief’s Regulation 4 (often called “Reg 4”) is the Los Angeles Fire Department program that requires building owners to have their fire and life-safety systems tested on a set schedule by LAFD-certified testers. It covers sprinklers, fire alarms, standpipes, fire pumps, smoke control, elevators, emergency generators and the methane gas detection systems built into active methane mitigation systems. This guide explains what Reg 4 covers, how often each system must be tested, who can do the testing, how results are filed and what to do when a test fails.

What Is LAFD Chief’s Regulation 4?

Chief’s Regulation No. 4 sets the minimum requirements for the periodic testing and repair of fire protection systems and equipment in buildings within the City of Los Angeles. It is administered by the LAFD Bureau of Fire Prevention and Public Safety, Chief’s Regulation No. 4 Unit. The goal is simple: life-safety equipment that sits idle for years must still work the day it is needed.

Reg 4 is a testing and repair program. It does not require older systems to be upgraded to current code. It requires the systems a building already has to be tested, documented and kept fully operable. Building owners are responsible for scheduling the tests, paying for repairs and keeping records.

The regulation works alongside the Los Angeles Fire Code and, for methane sites, the City’s Methane Code in Division 71 of the Los Angeles Building Code. The Methane Code sends annual testing of methane gas detection and mechanical ventilation systems to the Fire Department under Fire Prevention Bureau (F.P.B.) Requirement No. 71 and Chief’s Regulation 4, Section 4J.

Which Systems Require Reg 4 Testing?

LAFD lists the following fire protection systems and equipment under the Reg 4 program:

  • Basic and complex fire warning (fire alarm) systems
  • Central station (supervising station) signaling systems
  • Smoke management systems, pressurized stair shafts and smoke-proof enclosures
  • Automatic elevators (Phase I and Phase II emergency operation)
  • Emergency generator, emergency lighting and stored electrical energy (battery) systems
  • Fire doors and other automatic-closing fire assemblies
  • Fire escapes
  • Fire pumps
  • Class I, II, III, combined and Class H standpipes
  • Automatic fire sprinkler systems, including pre-action, deluge and dry pipe systems
  • Pressure reducing valves (PRVs) on hose connections
  • Gas detection systems, including methane gas detection systems installed as part of a methane mitigation system

For buildings in a Los Angeles Methane Zone or Methane Buffer Zone, the gas detection category is the one that matters most. It is explained in detail on our page on Reg 4 methane gas detection system testing.

Reg 4 Testing Frequency

Each system has its own interval. Most systems are tested every year, and sprinkler and standpipe systems also need a more involved test every five years.

SystemTest interval
Fire warning systems (basic and complex)1 year
Central station signaling systems1 year
Smoke management systems1 year
Automatic elevators1 year
Emergency generator and lighting systems1 year
Fire doors (all types and occupancies)1 year
Fire escapes1 year
Fire pumps1 year
PRVs, partial flow1 year
Pre-action, deluge and dry pipe sprinkler systems1 year
Methane gas detection and mechanical ventilation systems1 year (annual test under LAMC 91.7106)
Standpipes (Class I, II, III, combined and Class H)5 years
Automatic fire sprinkler systems5 years
PRVs, full flow5 years

Annual tests are generally performed in the same month each year (the system’s anniversary date), so a missed year is easy for the Fire Department to spot. For a full breakdown, see our Chief’s Regulation 4 testing frequency schedule.

Who Can Perform a Reg 4 Test?

Only a tester holding a valid LAFD certification for that type of system can perform a Reg 4 test. LAFD certifies testers by category (for example Automatic Sprinkler, Fire Pumps, Complex Fire Alarm, or Gas Detection), and publishes a list of currently certified Chief’s Regulation 4 testers for each category. A sprinkler tester cannot sign off a fire alarm, and a fire alarm tester cannot sign off a methane gas detection system unless they also hold the Gas Detection certification.

For methane systems, the Los Angeles Building Code requires testing by a person with a valid Certificate of Fitness for Gas Detection Systems. The current list of certified testers is on LAFD’s Gas Detection tester page. Learn how certification works, how to check a tester’s status and what becoming a tester involves on our page about LAFD Reg 4 certified testers.

How Reg 4 Test Results Are Submitted

After testing, the certified tester submits the results on Fire Department-approved forms. LAFD directs testers to file results through The Compliance Engine, an online reporting system, within 7 days of the test. Under LAFD’s Compliance Engine FAQ, reports for commercial high-rise buildings (75 feet or taller) must go through that system, while other buildings follow the reporting directions of their Fire Inspector. The participation fee for the reporting system is not set or collected by the City. Details are in LAFD’s Compliance Engine FAQs.

Keep your own copy of every report on site. Fire inspectors may ask for testing records during a routine inspection.

What Happens if a System Fails a Reg 4 Test?

When a test finds a defect, LAFD requires the owner to start corrections immediately and finish them as soon as possible, and no later than 30 days after the initial test. The system is then retested as needed to confirm it is fully operable. Some repairs also need a Fire Department permit.

For methane systems, common problems include sensors that have drifted out of calibration or reached the end of their service life, extraction fans that do not start on alarm, and wiring or panel faults between the sensors, the alarm and the fans. Because these parts were specified in the methane mitigation design, the system designer is the right person to involve when a repair changes how the system works.

Chief’s Regulation 4 and Methane Mitigation Systems

New buildings in a methane zone are built with a methane mitigation system sized to the site’s design methane concentration and design methane pressure, measured during methane testing. Passive systems rely on an impervious methane barrier, a gravel blanket, perforated pipe and vent risers. Higher site design levels add active components: a mechanical extraction system, gas detection sensors, a control panel and an alarm. Our guide to methane mitigation system components explains each part.

The active components are the ones that fall under Reg 4. Once the building is occupied, the gas detection system and its mechanical ventilation must be tested every year by an LAFD-certified Gas Detection tester. That annual test is the long-term check that the system Geo Forward designed and our methane deputy inspectors verified during construction still protects the people inside.

The methane system life cycle in the City of Los Angeles runs in four steps:

  1. Test: a methane soil gas survey sets the site design level (see LADBS methane test cost).
  2. Design: a methane mitigation plan goes through LADBS plan check, with gas detection and ventilation equipment approved by LAFD under F.P.B. Requirement No. 71.
  3. Inspect: methane deputy inspection during construction.
  4. Maintain: annual Chief’s Regulation 4 testing of the gas detection and ventilation system for the life of the building.

How Geo Forward Helps With Reg 4 Methane System Testing

Geo Forward does not perform Chief’s Regulation 4 testing itself. We design methane mitigation systems and provide methane deputy inspection, and because the annual Reg 4 test is an inspection of the active system we design, we arrange for an LAFD-certified Gas Detection tester to perform the test on our clients’ methane mitigation systems. That gives owners one point of contact who already knows how the system was designed and built.

  • We confirm which components of your system fall under Reg 4 (sensors, alarm, control panel and extraction fans).
  • We schedule the test with a certified Gas Detection tester and provide the approved plans and as-built information.
  • If the test finds a defect, our geologists help sort out whether it is a maintenance issue or a design issue, so it can be fixed within LAFD’s 30-day window.
  • For buyers and lenders, we can review Reg 4 testing records as part of a property condition assessment or Phase 1 environmental site assessment on a property in a methane zone.

Our methane work is led by Adam Azad Kaligi, PG, a licensed Professional Geologist, with Technical Director Michael Sabo and staff geologist Sirena Ulloa, GIT. Meet the rest of the Geo Forward team.

Why Reg 4 Matters for Methane Sites

Methane is odorless, lighter than air and explosive between 5% and 15% in air. Los Angeles adopted its modern Methane Code after the 1985 Fairfax methane explosion, and much of the city sits over oil fields and old oil wells that release methane soil gas, both petrogenic and biogenic. A gas detection system that has not been tested in years may not sound the alarm or start the fans when gas builds up beneath the slab. Annual Reg 4 testing closes that gap.

The Methane Code adds a few related duties for many buildings with gas detection or sub-slab vent systems, except single-family dwellings: a responsible person named as safety director, the Fire Department’s phone number posted in designated areas, and posted emergency procedures approved by LAFD. Non-residential buildings built with an impervious membrane also need a permanent notification placard at the front entrance.

Reg 4 Compliance Checklist for Building Owners

  1. List every fire protection and life-safety system in the building, including any methane gas detection and ventilation system.
  2. Find the date each system was last tested and its required interval.
  3. Hire an LAFD-certified tester for each system type, and confirm the certification is current.
  4. Make sure results are filed within 7 days of testing, as your Fire Inspector directs.
  5. Start repairs immediately and finish within 30 days, then retest.
  6. Keep copies of all reports, permits and repair records on site.
  7. Put next year’s anniversary test date on the calendar.

Chief’s Regulation 4 FAQs

What does Chief’s Regulation 4 require?

It requires building owners in the City of Los Angeles to have their fire protection and life-safety systems tested on a set schedule by LAFD-certified testers, to file the results with the Fire Department, and to repair any defects within 30 days.

Does Reg 4 apply to methane mitigation systems?

Yes, to the active parts. The Los Angeles Building Code requires annual testing of methane gas detection and mechanical ventilation systems under F.P.B. Requirement No. 71 and Chief’s Regulation 4, Section 4J, by a tester with a valid Certificate of Fitness for Gas Detection Systems. Passive components such as the membrane and vent risers are verified during construction by deputy inspection.

How often is a Reg 4 test required?

Most systems, including methane gas detection, are tested every year. Standpipes, automatic sprinkler systems and full-flow PRVs also need a five-year test. See the Reg 4 testing frequency schedule.

Who pays for Reg 4 testing?

The building owner pays for testing, filing and any repairs. Owners can pass some costs to tenants only as their leases allow.

How long do I have to fix a failed Reg 4 test?

Corrections must begin immediately and be finished no later than 30 days after the initial test, followed by a retest to confirm the system works.

Does Geo Forward perform Reg 4 tests?

No. We design and inspect methane mitigation systems, and we arrange for an LAFD-certified Gas Detection tester to perform the annual Reg 4 test on those systems. Call (888) 930-6604 to schedule.

Related Pages

Schedule Your Reg 4 Methane System Test

Own a building with an active methane mitigation system in Los Angeles? Call (888) 930-6604 (Mon–Fri, 8 am–5 pm PT), contact us, or request a proposal. We will arrange your annual test with an LAFD-certified Gas Detection tester. Building new in a methane zone? Start with methane testing and methane mitigation design.